The project involved the construction of five anaerobic digesters, each rising to a height of 22 metres. In total, the cluster required:
The slipforming process was carried out over 5.5 days of continuous 24-hour casting, demanding precise coordination and timely delivery of reinforcement materials to keep pace with the rapid construction schedule.
Capital Reinforcing supplied all the steel reinforcement for the Silo’s, working closely with Slipform Engineering to ensure seamless integration with the slipform process. Our team delivered to site around the clock, adapting to the demands of continuous casting and maintaining strict quality control throughout.
Key to our success was:
The project was delivered on time and to specification, with the reinforcement contributing to the structural strength and consistency of the Silos. The absence of cold joints and the precision of the slipform technique were complemented by the accuracy and reliability of our reinforcement.
This project stands as a strong example of Capital Reinforcing’s ability to deliver under pressure, support innovative construction methods, and contribute to sustainable infrastructure development.
Capital Reinforcing supplied all the steel reinforcement for the Silo’s, working closely with the customer to ensure seamless integration with the slipform process. Our team delivered to site around the clock, adapting to the demands of continuous casting and maintaining strict quality control throughout.
From our very first conversation, the team at Capital Reinforcing were professional, knowledgeable, and easy to work with. They took the time to explain the process clearly and delivered the work efficiently and to a high standard. Communication was consistent throughout, and the project was supplied exactly when they said it would be. We wouldn’t hesitate to recommend Capital Reinforcing to anyone looking for a reliable and well-organised Cut & Bent supplier